Step 1: Get a written spec from your engineer
-
Step 2: Download the Kennametal milling cutter catalog PDF
-
Step 3: Ask for a written quote — and ask what's included
-
Step 4: Confirm invoicing and payment terms before the order ships
-
Step 5: Check delivery time against your production schedule
-
Step 6: Verify the delivery against the invoice
-
Step 7: File everything
-
Common mistakes (the 'don't do what I did' section)
I'm the office administrator for a 70-person manufacturing company. I handle procurement across 8 vendors — roughly 70-80 purchase orders a year, around $600,000 in total spend. I report to both the operations manager and the finance director, which basically means I get it from both sides when something goes sideways.
About three years ago, I added Kennametal milling cutters to my procurement list. The first two orders were a mess. One invoice got bounced because the PO number was missing. Another time, we paid for 12 inserts but received 10. (Should mention: the box was sealed and labeled 12. I didn't open it.)
So I built a checklist. It's not glamorous. But I haven't had an invoice bounce in 18 months. Here's the 7-step process I use every time I order Kennametal milling cutters.
Step 1: Get a written spec from your engineer
Don't just order "milling cutters." Ask your machinist or engineer for the exact part numbers, quantities, and which job they're for. We have a pump machining center that runs almost continuously — when that center goes down, we're losing money by the hour. So I need to know: which cutters are for the pump line, and which are for other jobs?
If your engineer says "just get the same ones as last time," pull up the old purchase order and verify. Part numbers change. (I learned that the hard way.)
Step 2: Download the Kennametal milling cutter catalog PDF
Kennametal publishes a milling cutter catalog PDF on their website. It's not light reading. There are hundreds of pages of part numbers, specs, and application data.
Here's what I do: I don't read the whole thing. I search for the specific product family my engineer named. I cross-check the part number against the catalog. If I can't find it, I ask the engineer to confirm. (Note to self: keep a shortlist of the 10 part numbers we order most often — it saves 20 minutes every time.)
Step 3: Ask for a written quote — and ask what's included
This is where I apply my personal rule: I always ask "what's included" before I ask "what's the price."
From the outside, a lower quote looks like a better deal. The reality is that a lot of quotes hide shipping, tax, minimum order fees, or expedite charges. I've seen quotes that were 15% lower than the competition — and 25% higher once the extra charges were added.
So I ask for a written quote that lists: unit price, shipping, taxes, any setup or minimum order fees, and delivery date. If the vendor won't put it in writing, that's a red flag.
Step 4: Confirm invoicing and payment terms before the order ships
This is the step most people skip. (Honestly, I skipped it for the first year.)
According to UCC Article 2-201, contracts for the sale of goods over $500 need to be in writing. That's a legal minimum — but your finance department probably has stricter rules.
I once ordered about $2,400 worth of tooling from a new supplier. Their price was great. Their invoice was handwritten. Finance rejected it, and I ate the cost out of my department budget. Now I ask every new vendor: can you send a PDF invoice with our PO number, payment terms, and tax ID? If the answer is no, I don't place the order.
Step 5: Check delivery time against your production schedule
Standard delivery times vary by spec. Kennametal lists lead times for many standard products on its website, but custom tools often need a direct quote. Your pump machining center doesn't care about "usually." It needs the cutter when the job starts.
I always get the delivery date in writing. And I build in a 3-day buffer (should mention: our receiving dock is slow).
Oh, and if your engineer tells you "we need it tomorrow" — that's a rush order. Rush orders usually come with different pricing and different workflows. Ask about rush fees before you commit.
Step 6: Verify the delivery against the invoice
When the box arrives, don't just forward the invoice to finance. Open the box. Count the inserts. Check the part numbers. Compare against the packing slip and the invoice.
The third time we ordered the wrong quantity, I finally created a verification checklist. Should have done it after the first time. (We once paid for 12 inserts and got 10. The box was sealed and labeled 12. I didn't open it. That cost us about $180 — not huge, but embarrassing.)
Step 7: File everything
Keep the quote, the PO, the invoice, and the delivery confirmation. If your finance team is ever audited, or if a vendor disputes a charge, you'll need all four.
I keep a digital folder per vendor per quarter. It takes about 2 minutes to set up and has saved me hours of scrambling.
Common mistakes (the 'don't do what I did' section)
- Don't trust the catalog price. The catalog lists the list price — not your price. Shipping and taxes can add a meaningful chunk on top.
- Don't skip the PO number. Finance will bounce the invoice. Ask me how I know.
- Don't stock up just because "the price is good today." Inventory costs money too.
- Don't assume the process is different for other equipment. I recently had to evaluate a 3D printer (the Orange Storm Giga model was on our shortlist). The process was exactly the same: written spec, written quote, PO number, delivery confirmation. (Fun fact: 3D printers are actually being used to help sea turtles — researchers print artificial reef structures. I don't know how that conversation started, but it's a good reminder that even weird equipment purchases follow the same basic process.)
And honestly? The checklist works. It's not exciting. But I haven't had an invoice bounce in 18 months, and my operations manager stopped asking me why the cutters are late.